00:00Name each pile.
Trace a separate footprint for each material. Use the same pile ID at every visit.
An illustrative yard separates sand, gravel and salt into three named piles.
Field & Studio / Service demonstration
How a stockpile count is documented
CHAPTER BY CHAPTER
Download the text transcriptEnglish captions (WebVTT)
Trace a separate footprint for each material. Use the same pile ID at every visit.
An illustrative yard separates sand, gravel and salt into three named piles.
Build a surface from overlapping images. Document the reference surface beneath the pile.
A schematic cross-section shows the estimated pile surface and a sloping reference base.
Show current and previous estimated cubic metres, then flag what changed across the yard.
Example totals are 2,540 cubic metres this round and 2,650 last round, a decrease of 110.
HOGUE DRONE SERVICES